SECONDHAND GENERATORS
The Best Place To Buy And Sell Generators
The page you are looking for no longer exists.
Please look at some similar items.
Trailer Mounted, CAT, 100KVA, 2017, 6540hrs - Staffordshire
CAT, 100 KVA, 2017 , 6540 HrsTrailer mounted Event spec generator
Super silent with lots of distro built in.
Maintained to a high standard and very reliable
Has a 48Hr Fuel tank built in.
Champion 7000 Watt LPG Dual Fuel Generator With Electric Start - Eastbourne, East Sussex
Portable Propane or Gasoline Dual Fuel GeneratorEasy, economic and reliable – the Champion 7000-watt LPG Dual Fuel Generator is an ideal companion for camping trips, outdoor events or support in a power outage.
20x Crowd/Pedestrian Barrier 2.3m - Staffordshire
Crowd / Pedestrian Barrier 2.3mEx-hire stock.
Has no broken or bent panels.
Will do a deal on all of them.
Power Distribution Cart - Shropshire
Power distribution system.Provides easy method of connecting to a Generator or fixed power sauce then distributing it around the stage or event.
Comes on a fork lift-able trolley on wheels with waterproof covers.
Has Hubbel connectors easily converted to Ceeform.
Gravity Fed Fuel Tank - Northamptonshire
Gravity fed fuel tank for sale.625kva Rolls Royce 3012 Diesel Generator - Merseyside
In full good working condition, well looked after throughout its life cycleServiced every 6 months
Load tested at full load every 12 months
PowerBOX Rubber 32Amp 3pH+N+E 400V Turtle Box with PCE Midnight Series to 6 x 16A 1pH+N+E 6 x RCBO's Type A - Kent
Supplied with PCE Midnight Series (Black) plugs and sockets with RCBO breakers on each outgoing sockets.FG Wilson 30kva 1 Phase Open Generator - Hertfordshire
FG Wilson 30 kva single phase, open generator (NO INTERNAL TANK).Very low hours as used for standby.
Serviced every 3 months from new.
Staines and Golding 20Kva Generator on Trailer - Suffolk
Sold in 24 hours!
625kva Rolls Royce 3012 Diesel Generator - Merseyside
In full good working condition, well looked after throughout its life cycleServiced every 6 months
Load tested at full load every 12 months
Load more listings